  10MWp Grid-connected Power Station in Qingtongxia,Ningxia 
 
 
 
Location: New Material Foundationin Qingtongxia,Ningxia 
Scale: 10MWp 
Details: Monocrystalline solar panels installed with steel bracket in fixed angle 
Investor: China Datang Renewable Power Co.,Ltd 
Contractor: Atsun Solar Electric Technology Co.,Ltd 
Construction Period: Started in Feb 15,2011 and combined to the grid in Sep 28,2011 
 
 